Cross analysis
Traceability matrix
Coverage of requirements by IVV tests for EOLE Wind Farm Controller.
4
Requirements
3 (75 %)
Covered by at least one test
2 (50 %)
Verified — all linked tests passed
2 / 3
Tests passed
| Req ID | Requirement | Module | Status | Linked IVV tests | Coverage |
|---|---|---|---|---|---|
| REQ-001 | The controller shall regulate active power within ±2% of the setpoint. | System requirements | Accepted |
PASS
Active power regulation test at 50%, 75% and 100% load
(Qualification campaign)
+ 1 other link(s)
|
Verified |
| REQ-002 | The controller shall detect grid frequency deviations above 0.5 Hz within 100 ms. | System requirements | Accepted |
PASS
Grid frequency deviation injection (0.6 Hz step)
(Qualification campaign)
+ 1 other link(s)
|
Verified |
| REQ-003 | The HMI shall display the status of every turbine in real time. | System requirements | In negotiation |
FAIL
HMI real-time display load test (88 turbines)
(Qualification campaign)
|
Covered |
| REQ-004 | The system shall log all safety events for at least 10 years. | System requirements | Accepted | — | Not covered |